Customization: | Available |
---|---|
Connection Type: | Clamp Connection |
Finish: | Eletro Galvanized/ Hot DIP Galvanized |
Still deciding? Get samples of US$ 1.42/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Our renowned steel tube scaffold fasteners are the groundbreaking backbone of modern construction triumphs, garnering praise for their ease of processing, budget-conscious nature, and outstanding economic returns. Widely adopted in a spectrum of construction ventures, they symbolize unwavering reliability and exceptional cost-efficiency.
Advantages
1. Experience unparalleled versatility harmoniously blended with affordability, making it the favored choice across a myriad of applications.
2. Effortlessly supports impressive building heights, ensuring steadfast stability and robust strength.
3. Designed for simple, adaptable installation, streamlining your construction process to perfection.
4. Boasts remarkable durability, ensuring a higher turnover rate and a prolonged operational lifespan.
5. Perfect for both external and internal scaffolding, broadening its applicability across various environments.
Commodity | Specification mm | Normal weight (g) | Customized | Raw Material | Surface treatment |
BS1139/EN74 Double coupler | 48.3x48.3mm | 980g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Double coupler | 48.3x60.3mm | 1350g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Double coupler | 60.3x60.3mm | 1600g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Swivel coupler | 48.3x48.3mm | 1200g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Swivel coupler | 48.3x60.3mm | 1370g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Swivel coupler | 60.3x60.3mm | 1600g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Putlog coupler | 48.3mm | 580g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Board retaining coupler | 48.3mm | 570g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Sleeve coupler | 48.3x48.3mm | 1000g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Inner Joint Pin Coupler | 48.3x48.3mm | 820g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Beam Coupler | 48.3mm | 1020g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
American type Double Coupler | 48.3x48.3mm | 1500g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
American type Swivel Coupler | 48.3x48.3mm | 1700g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
German type Double Coupler | 48.3x48.3mm | 1250g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
German type Swivel Coupler | 48.3x48.3mm | 1450g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
For over a decade, Hebei Haihong Construction Equipment Co., Ltd has been a cornerstone in manufacturing steel supports, scaffolding, and spring clamps, consistently delivering excellence and reliability.
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T,for products need new production for common materials,usually make shipments in 7-10 daysfor products need new special and rare materials,usually need 15-20 days to make shipment
Q2: Could you provide sample?
A:Samples can be provided with samples' charge and courier fee by the buyer's side
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. Can you accept customize?
A: Yes. lt can be customized as per the customers' request.
Q5: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We
will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT It usually takes 3-5 days to arriveAirline and sea shipping also optional.
For mass products, ship freight is prefered.