Customization: | Available |
---|---|
Connection Type: | Snap-on Connection |
Finish: | Galvanized&Painted |
Still deciding? Get samples of US$ 15.3/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Immerse yourself in the unparalleled experience of seamless mobility with our expertly crafted 6" and 8" scaffolding caster wheels. These engineering marvels-constructed from resilient and long-lasting PU steel-are meticulously designed to enhance the agility and efficiency of your mobile scaffolding systems. Enjoy operations that glide with unmatched smoothness and precision, revolutionizing your workflow.
Explore our exceptional array of sturdy PU wheels and robust rubber wheels, available in both fixed and swivel designs. These versatile options are artfully engineered to meet a wide spectrum of applications, ensuring your individual requirements are met with extraordinary precision and adaptability.
Scaffolding Part Type | wheel |
Pole Height | 300mm |
Pole Diameter | 30132/35mm |
Size | 6 inch |
Surface treatment | Galvanized&painted |
Scaffolding wheel material | Casting iron, PVC,PP, PU |
wheel width | 50/45MM |
Wheel diameter | 150mm |
Color | Silver |
Name | Caster wheels |
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T,for products need new production for common materials,usually make shipments in 7-10 daysfor products need new special and rare materials,usually need 15-20 days to make shipment
Q2: Could you provide sample?
A:Samples can be provided with samples' charge and courier fee by the buyer's side
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. Can you accept customize?
A: Yes. lt can be customized as per the customers' request.
Q5: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We
will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT It usually takes 3-5 days to arriveAirline and sea shipping also optional.
For mass products, ship freight is prefered.