Customization: | Available |
---|---|
Connection Type: | Pin Connection |
Finish: | Galvanized |
Still deciding? Get samples of US$ 5.65/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Scaffold JACK BASE with square plate | ||||
DIAMETER MM |
LENGTH MM |
PLATE SIZE MM |
SURFACE TREATMENT | WEIGHT KGS |
φ30(SOLID) | 400 | 120*120*4 | Galvanized/Painted | 2.61 |
φ30(SOLID) | 600 | 120*120*4 | Galvanized/Painted | 3.58 |
φ32(SOLID) | 400 | 120*120*4 | Galvanized/Painted | 2.9 |
φ32(SOLID) | 600 | 120*120*4 | Galvanized/Painted | 4.01 |
φ34(SOLID) | 400 | 140*140*4 | Galvanized/Painted | 3.41 |
φ34(SOLID) | 600 | 140*140*4 | Galvanized/Painted | 4.67 |
φ38(HOLLOW) | 600 | 150*150*5 | Galvanized/Painted | 3.39 |
φ48(HOLLOW) | 600 | 150-150*6 | Galvanized/Painted | 4.33 |
U HEAD JACK BASE | ||||
DIAMETER MM |
LENGTH MM |
PLATE SIZE MM |
SURFACE TREATMENT | WEIGHT KGS |
φ30(SOLID) | 400 | 120*150*50*4 | Galvanized/Painted | 3.11 |
φ30(SOLID) | 600 | 120*150*50*4 | Galvanized/Painted | 4.08 |
φ32(SOLID) | 400 | 120*150*50*4 | Galvanized/Painted | 3.4 |
φ32(SOLID) | 600 | 120*150*50*4 | Galvanized/Painted | 4.51 |
φ34(SOLID) | 400 | 120*150*50*4 | Galvanized/Painted | 3.75 |
φ34(SOLID) | 600 | 120*150*50*4 | Galvanized/Painted | 5.01 |
φ38(HOLLOW) | 600 | 120*150*50*5 | Galvanized/Painted | 3.99 |
φ48(HOLLOW) | 600 | 120*150*50*6 | Galvanized/Painted | 5.23 |
1. High Precision: Meticulously crafted to surpass the most stringent construction standards, ensuring exceptional accuracy. Elevate your projects with unparalleled quality and precision.
2. Reliability: Engineered for outstanding durability and optimal performance, even in the harshest conditions. Experience unwavering reliability, instilling confidence and consistent stability in every task.
Hebei Haihong Construction Equipment Co., Ltd: With over a decade of relentless innovation and distinguished excellence, we lead in producing top-tier steel supports, scaffolding, and spring clamps. Our reputation for quality and reliability sets new industry standards, making us a beacon of trust in the construction landscape.
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T,for products need new production for common materials,usually make shipments in 7-10 daysfor products need new special and rare materials,usually need 15-20 days to make shipment
Q2: Could you provide sample?
A:Samples can be provided with samples' charge and courier fee by the buyer's side
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. Can you accept customize?
A: Yes. lt can be customized as per the customers' request.
Q5: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We
will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT It usually takes 3-5 days to arriveAirline and sea shipping also optional.
For mass products, ship freight is prefered.