Customization: | Available |
---|---|
Connection Type: | Clamp Connection |
Finish: | Eletro Galvanized/ Hot DIP Galvanized |
Still deciding? Get samples of US$ 1.42/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This fastener-type steel tube scaffold is the most extensively utilized scaffolding system in construction engineering due to its straightforward processing, cost-effectiveness, and superior economic value.
Advantages
1. Exceptionally versatile and cost-efficient.
2. Supports high-rise building constructions.
3. Installation is both easy and highly flexible.
4. Robust, durable, and offers high turnover rates.
5. Suitable for both exterior and interior scaffolding needs.
Commodity | Specification mm | Normal weight (g) | Customized | Raw Material | Surface treatment |
BS1139/EN74 Double coupler | 48.3x48.3mm | 980g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Double coupler | 48.3x60.3mm | 1350g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Double coupler | 60.3x60.3mm | 1600g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Swivel coupler | 48.3x48.3mm | 1200g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Swivel coupler | 48.3x60.3mm | 1370g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Swivel coupler | 60.3x60.3mm | 1600g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Putlog coupler | 48.3mm | 580g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Board retaining coupler | 48.3mm | 570g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Sleeve coupler | 48.3x48.3mm | 1000g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Inner Joint Pin Coupler | 48.3x48.3mm | 820g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
BS1139/EN74 Beam Coupler | 48.3mm | 1020g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
American type Double Coupler | 48.3x48.3mm | 1500g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
American type Swivel Coupler | 48.3x48.3mm | 1700g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
German type Double Coupler | 48.3x48.3mm | 1250g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
German type Swivel Coupler | 48.3x48.3mm | 1450g | Yes | Q235 | Eletro Galvanized/ Hot dip Galvanized |
For over a decade, Hebei Haihong Construction Equipment Co., Ltd has specialized in manufacturing steel supports, scaffolding, and spring clamps.
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T,for products need new production for common materials,usually make shipments in 7-10 daysfor products need new special and rare materials,usually need 15-20 days to make shipment
Q2: Could you provide sample?
A:Samples can be provided with samples' charge and courier fee by the buyer's side
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. Can you accept customize?
A: Yes. lt can be customized as per the customers' request.
Q5: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We
will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT It usually takes 3-5 days to arriveAirline and sea shipping also optional.
For mass products, ship freight is prefered.